Tips On Hardwood Flooring Installation Baltimore MD

By Cornelia Reyes


Home owners who enjoy doing their own work will probably want to try their hand at putting in some new floors. Today many people realize that carpeting traps a lot of dust and can be quite a health problem. This is especially true if a member of the household suffers from allergies or asthma. Hardwood flooring installation Baltimore MD is a perfect job to tackle as it not only saves money but also adds value to the property.

Installing a new floor is a great project for a DIY enthusiast. They can save a lot of money and gain the satisfaction of knowing that they achieved the job by themselves. Many people each year successfully tackle this type of job with excellent results. However, before they begin there are some important points to understand.

The key to successful hard wood floor installation is good preparation. Time must be devoted to getting the floors completely level. This may involve installing a sub floor. The most typical materials for a sub floor are concrete or plywood sheeting. Concrete is a good option as it naturally fills in any low spots. However, care must be taken to ensure that the surface is completely level.

Solid wood floor boards cannot be installed over newly poured concrete for at least sixty days. Solid wood is affected by any type of dampness, moisture or humidity. The weather conditions in the home at the time the floor is installed must be taken into consideration. Solid wood cannot be used in a basement as they is often too much moisture. For a basement a laminate or engineered hard wood is the preferred choice.

The concrete should be checked thoroughly for bumps or ridges. If any are found they should be filled in or sanded to create a truly level surface. Engineered boards can be glued down with a special adhesive. Solid wood cannot be installed for at least sixty days after the concrete has been poured. This allows for it to dry completely. A moisture test is also important to check that the surface is ready.

Once the floor boards have been delivered to the home they should be unpacked at least two days before they will be installed. This is a very important step that allows them to acclimatize to the environment and also allow for any warping or bending.

Typically people use a pneumatic nail gun to install the boards. These nail guns can be rented for a local rental center. They save a lot of time and work and do a great job. Getting the first few boards really level is the key to a successful finish. Carefully measurements must be taken to establish lines to work from. If those lines are straight they rest of the floor will be installed properly.

A professional can have a whole house completed in a matter of hours, but a amateur DIY enthusiast will need longer. They should familiarize themselves with the power tools they will need for hardwood flooring installation Baltimore MD. Most people work with a pneumatic nail gun as it quick and simple to use.




About the Author:



Aucun commentaire:

Enregistrer un commentaire